LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
DOTD A-Z
ALL A B C D E F G H I J K L M N O P Q R S T U V W      Acronyms     Sections

Unbonded Overlay
An HMA overlay over an existing HMA or PCC pavement, generally less than 25 mm (1 in) in thickness. – Increase in the pavement structure of an existing concrete or composite pavement by addition of jointed plain, jointed reinforced or continuously reinforced concrete pavement placed on a separator layer (usually an asphalt layer) designed to prevent bonding to the existing pavement.

 Free Tourist Map
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.